Saturday, 27 August 2011

Back on the road

fitted last few trims, painted wheels and took her for MOT which she sailed through 





    

Thursday, 25 August 2011

Offside

polished offside and attached door mirror and trims




Wednesday, 24 August 2011

Nearside

polished roof and nearside attached door mirror and trims





Saturday, 20 August 2011

Almost done

attached mud flaps





painted and attached front and rear doors







built up rear door cards and fittings




Tuesday, 16 August 2011

Saturday, 13 August 2011

wheel arches

cleaned and attached wheel arches, also attached front and rear bumpers









attached tailgate 



Friday, 12 August 2011

bumpers and tailgate

painted bumpers





painted tailgate




attached bonnet, sunroof and petrol flap




Tuesday, 9 August 2011

More paint

Put some paint on the bonnet 






sunroof






and petrol flap



Sunday, 7 August 2011

induction and oil catcher

fitted induction kit




also mounted oil catcher






then I fired her up and drove her outside to see what she looked like in daylight 





Saturday, 6 August 2011

seats

fitted seats and dash board 





attached brake callipers fitted with braided lines and omp pads





Wednesday, 3 August 2011

rear axle

Attached rear axle






also fitted new drilled and grooved brake discs 







fitted oil cooler


Monday, 1 August 2011

Gearbox

Mounted gearbox





attached drive shaft with new inner and outer cv joints