Sunday, 31 July 2011

Rear shocks and Engine

Attached rear shockers



bandaged exhaust manifold to reduce heat in Engine bay 

 
lifted Engine into position and attached rear mounting



attached new peddles 


Saturday, 30 July 2011

front subframe

Bolted up front subframe and wishbones fitted with new poli-bushes and OMP lower strut-brace











also attached front coil-overs and hubs




Saturday, 23 July 2011

few odd bits

Fitted petrol tank





also fitted fuel pump and fuel lines






and brake master cylinder


Friday, 22 July 2011

The Engine

This Engine I put together about 2000 miles ago before I discovered my old shell was rotten (hence the re-build) 





It has an 1800 bottom end with a stage 1 head, fast road cam and a stainless steel 4 branch manifold 


heater box and engine loom

fitted heater box and engine loom






and also fitted new poli-bushes and new gaiters  to steering rack and mounted to subframe


Sunday, 3 July 2011

Boot

Today I started fitting out the boot area





Then I fitted new sill decals and door rubbers




 And new tail lights


sound proofing and wiring loom

Yesterday I started re-assembling the car


  
First I fitted new windscreen and gromits and cables into bulk-head




Then I fitted sound proofing and wiring loom to interior