Golf MK2 re-build
Sunday, 31 July 2011
Rear shocks and Engine
Attached rear shockers
bandaged exhaust manifold to reduce heat in Engine bay
lifted Engine into position and attached rear mounting
attached new peddles
Saturday, 30 July 2011
front subframe
Bolted up front subframe and wishbones fitted with new poli-bushes and OMP lower strut-brace
also attached front coil-overs and hubs
Saturday, 23 July 2011
few odd bits
Fitted petrol tank
also fitted fuel pump and fuel lines
and brake master cylinder
Friday, 22 July 2011
The Engine
This Engine I put together about 2000 miles ago before I discovered my old shell was rotten (hence the re-build)
It has an 1800 bottom end with a stage 1 head, fast road cam and a stainless steel 4 branch manifold
heater box and engine loom
fitted heater box and engine loom
and also fitted new poli-bushes and new gaiters to steering rack and mounted to subframe
Tuesday, 19 July 2011
Front wings
attached and painted front wings
Carpets
fitted new carpets
installed headlining
Sunday, 3 July 2011
Boot
Today I started fitting out the boot area
Then I fitted new sill decals and door rubbers
And new tail lights
sound proofing and wiring loom
Yesterday I started re-assembling the car
First I fitted new windscreen and gromits and cables into bulk-head
Then I fitted sound proofing and wiring loom to interior
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)